GB/T 19568-2025 English PDF - Wind Turbines: Assembly & Installation Spec

Full Standard Name

Wind energy generation systems—Assembling and installation specification of wind turbines

GB/T 19568-2025 Wind energy generation systems—Assembling and installation specification of wind turbines

Standard Details

Sector / Industry Energy
Standard Type GB/T (Recommended)
Standard Status Valid
Older Standard GB/T 19568-2017
CCS Classification F11
ICS Classification 27.180
Issue Date 2025-10-31
Implementation Date 2026-05-01
File Type PDF
PDF Page Count About 21 pages
Competent Department China Machinery Industry Federation
Quoted Standard GB/T 9327,GB/T 19072,GB/T 20319

GB/T 19568-2025 (English Version)

$99/PDF
  • English translated version
  • Sent to your email in 24h

GB/T 19568-2025 (Chinese Version)

$49/PDF
  • Chinese original version
  • Sent to your email in 12h

Standard Introduction

This document specifies the general requirements, assembly requirements for key components, wind farm installation requirements, inspection requirements, and validation methods for the assembly and installation of wind turbine generators.

This document applies to the assembly and installation of wind turbine generators.

Standard Catalog

The standard consists of the following main sections:

  • Foreword

  • 1 Scope

  • 2 Normative References

  • 3 Terms and Definitions

  • 4 General Requirements

  • 4.1 General Provisions

  • 4.2 Connection Requirements

  • 5 Assembly Requirements for Key Components

  • 5.1 Main Shaft Bearing Assembly

  • 5.2 Drive Train Assembly

  • 5.3 Assembly of Yaw Bearing, Pitch Bearing and Yaw Gear Ring

  • 5.4 Brake Assembly

  • 5.5 Assembly of Yaw and Pitch Drive Units

  • 5.6 Elastic Support Assembly

  • 5.7 Drive Train Assembly

  • 5.8 Generator Assembly (with Flexible Coupling)

  • 5.9 High-speed Shaft Coupling

  • 5.10 Hydraulic and Lubrication System Assembly

  • 5.11 Nacelle Cover and Hub Cover Assembly

  • 6 Wind Farm Installation Requirements

  • 6.1 Safety Requirements

  • 6.2 Installer Requirements

  • 6.3 Installation Site Requirements

  • 6.4 Installation Requirements for Key Components in Wind Farms

  • 7 Inspection Requirements

  • 8 Validation Methods

  • Appendix A (Informative) Secondary Anti-corrosion Requirements for Accessories

  • Appendix B (Informative) Preload and Tightening Torque for General Connection Bolts

  • Appendix C (Normative) Inspection Method for Bolt Tightness

English Version Preview

Preview of the English translated version (about 5 pages):

Download English Preview PDF

Chinese Version Preview

Preview of the original Chinese version (about 5 pages):

Download Chinese Preview PDF